Location

Manisa

Type of Mounting

Industrial Roofing

Installed Power (kWp)

553,50

Annual Targeted Production (kWh/year)

766.200

Planned Production (kWh/kWp/year)

1.384

Targeted Performance Ratio PR(%)

80,48%

Commissioning Date

May 2022