Location

Manisa

Type of Mounting

Industrial Roofing

Installed Power (kWp)

3.336,16

Annual Targeted Production (kWh/year)

5.167.560

Planned Production (kWh/kWp/year)

1.549

Targeted Performance Ratio PR(%)

88,70

Commissioning Date

January 2025