Location

Çanakkale

Type of Mounting

Land

Installed Power (kWp)

999,90

Annual Targeted Production (kWh/year)

1.384.000

Planned Production (kWh/kWp/year)

1.384

Targeted Performance Ratio PR(%)

82,34%

Commissioning Date

November 2024