Location

Manisa

Type of Mounting

Industrial Roofing

Installed Power (kWp)

122,08

Annual Targeted Production (kWh/year)

161.300

Planned Production (kWh/kWp/year)

1.321

Targeted Performance Ratio PR(%)

77,07%

Commissioning Date

September 2023