Location

Manisa

Installed Power (kWp)

924,00

Annual Targeted Production (kWh/year)

1.330.680

Planned Production (kWh/kWp/year)

1.440

Targeted Performance Ratio PR(%)

81,73

Commissioning Date

November 2024