Location

İstanbul

Type of Mounting

Industrial Roofing

Installed Power (kWp)

720,50

Annual Targeted Production (kWh/year)

940.696

Planned Production (kWh/kWp/year)

1.306

Targeted Performance Ratio PR(%)

86,34%

Commissioning Date

April 2023