Location

İstanbul

Type of Mounting

Industrial Roofing

Installed Power (kWp)

56,84

Annual Targeted Production (kWh/year)

67.270

Planned Production (kWh/kWp/year)

1.183

Targeted Performance Ratio PR(%)

81,23

Commissioning Date

January 2025