Location

Malatya

Type of Mounting

Industrial Roofing

Installed Power (kWp)

1.485,13

Annual Targeted Production (kWh/year)

2.236.606

Planned Production (kWh/kWp/year)

1.506

Targeted Performance Ratio PR(%)

82,70%

Commissioning Date

May 2023