Location

Manisa

Type of Mounting

Land

Installed Power (kWp)

4604,6

Annual Targeted Production (kWh/year)

7.869.150

Planned Production (kWh/kWp/year)

1.709

Targeted Performance Ratio PR(%)

85,59%

Commissioning Date

Devam Ediyor